I’ve spent enough time around steel lines and pilot mills to know that the unsung hero is often the humble water cooling system for water tank. When it runs well, nobody notices. When it doesn’t, everything—from roll flatness to bath chemistry—goes sideways. That’s why I paid attention when YWLX (Beijing YWLX, Origin: No.1518, LAR Valley Int'l, Guang’anmen Avenue, Xicheng District, Beijing, 100055) began bundling revamp engineering and spare parts around tank-based cooling loops for process lines and university labs. It sounds niche, but it’s very 2025: tighten control, save power, extend life.
Trends we’re seeing: switch to closed-loop glycol with plate heat exchangers, variable-speed pumps, and smarter PID/PLC logic that talks to AGC/shape control. Actually, the software matters as much as the steel. Many customers say energy cuts of 10–18% are realistic after a proper retrofit, though real-world use may vary with climate and tank geometry.
Under the banner “Revamping service and Spare Parts,” YWLX upgrades legacy lines (think Continuous Galvanizing Lines with Skin Pass Mill) and supports testing mills used by GRINM and other institutes. For a water cooling system for water tank, they re-engineer: tank internals (SS316L baffles), heat exchangers (Brazed/plate, CuNi or titanium plates for corrosive media), pumps, valve blocks, sensors, and the control loop tied to line setpoints.
Typical flow: intake filtration → variable-speed pump → plate heat exchanger → distribution manifold → tank mixing/baffles → return. Materials: SS316L, HDPE (chem-resistant lids/liners), EPDM/FKM seals, CuNi or Ti plates where chloride is a risk. Methods: CFD-guided tank mixing, NPSH checks, and cavitation audit. Testing standards referenced on projects include ASME B31.3 (piping), API 650 (welded tanks), and pressure/leak tests to GB/T 9119. Service life: ≈10–15 years for major components; seals ≈3–5 years depending on chemistry.
| Parameter | Typical value | Notes |
|---|---|---|
| Cooling capacity | 150–800 kW | Scalable; real-world use may vary |
| Flow rate | 40–220 m³/h | ΔT ≈ 5–8°C |
| Tank volume | 10–60 m³ | With mixing baffles |
| Controls | PLC + PID + VFD | AGC/line interface via Modbus/Profinet |
| Materials | SS316L, CuNi/Ti plates | Corrosion-resistant selection |
| Compliance | ISO 9001, CE (where required) | Project-specific documentation |
| Vendor | Customization depth | Certs | Lead time | On-site support |
|---|---|---|---|---|
| YWLX (Revamping service and Spare Parts) | High (tank, HX, PLC, hydraulics) | ISO 9001, CE (project-based) | ≈8–14 weeks | Global commissioning |
| General OEM | Medium (catalog-centric) | ISO/CE | 10–20 weeks | Regional |
| Local fabricator | Variable | Varies | 4–12 weeks | On demand |
Industries: metals rolling (hot/cold), CGL, pickling lines, nonferrous research, and, surprisingly, fermentation/aquaculture pilot tanks that need ±0.5°C stability. In one CGL revamp, we measured ΔT control tightened from ±3.2°C to ±1.4°C, with pump energy down ≈15% via VFDs. At GRINM-related pilot setups, stable alloy trials only happened after the water cooling system for water tank loop stopped “hunting” around setpoint.
YWLX tweaks manifolds, HX metallurgy, and PLC logic per fluid chemistry. Factory FAT includes hydrostatic test (1.5× design pressure), flow/ΔP verification, PID tuning, and I/O simulation. Field SAT adds thermal load tests and alarm validation. Test data from recent jobs: COP ≈ 4.1 at 32°C ambient; ΔT 7°C; specific energy ≈0.28–0.35 kWh/ton of product (metals line).
“We stopped chasing temperature drift,” a plant manager told me—“and quality complaints quietly disappeared.” Another customer noted spare parts availability (bearing chocks, hydraulic valve blocks) reduced unplanned downtime; small thing, big effect.